A turn-key project Farrow Walsh advised on the geotechnical, earthworks strategy, structural and drainage elements required to safeguard the property from flooding due to the River Soar.
The original property was demolished to create an entirely new property rising above the flood plain, utilising the area of land available and creating a larger dwelling for the client.