With the targeted programme of improvements for the A43 corridor between the M1 and M40 the prime site location brought with it considerable construction issues all of which were managed at design and construction stages when looking at the new build.
A design and build project, Farrow Walsh advised on the earthworks strategy and external levels in conjunction with planning restriction. The operational and logistical issues involved with a construction project situated within a busy location allowed us to demonstrate innovation in our approach to the earthworks and drainage design.