Neighbouring the Brookland Road project, Farrow Walsh advised on the phased demolition of the existing structures with 1200mm diameter public sewers running through the site.
A particularly tight site to develop with varying ground depths due to the historic minerals extraction pit adjacent to the site from a pre-existing brick factory meant the foundations had to be piled.